- EMC and safety tests - see What every Product Development Manager and Executive Need to Know About EMC;
What Every Product Development Manager and Executive Need to Know About Product Safety
- Environmental safety requirements; elimination of hazardous substances - RoHS
- Recyclable requirements: design for reuse, reclamation, disposal - WEEE
- QC tests (PRS)
- System Verification Plan (design reviews, test, analysis, inspections…) (DTR2)
- Wire Lists (DDOC)
- Product feature/performance upgrade mechanism and plan
- Subsystem Integration & test Plans (DTR2)
- Assembly instructions
- Perform an objective design review and fault analysis (DDOC)
- ID concepts(DDOC)
- Model concepts as soon as possible (failing early is cheap!)
- Characterize test Inputs vs. outputs (PRS), (DTR2)
- The manufacturing (and other required) processes are developed
- Design Traceability mechanisms: e.g. matrix, flow charts, etc. (DDOC)
- Design & Hazard/risk review: e.g. FMEA (DDOC)
- Schematics and parts drawings (DDOC)
- Begin Soft and Hard-tooling concepts (DDOC)
- Begin manufacturer selection and review (DDOC)
- Preliminary COM (DDOC)
- Manage document changes with the change control plan (DDOC)
- Mechanical Design (DDOC)
- Electrical Design (DDOC)
- Software/firmware Design (DDOC)
- Manuals, Labels, Cables & Accessories (DDOC)
- Develop 'procured part' specifications
- Preliminary hard-tooling requirements defined (DDOC)
|