- Involved team: Marketing, Engineering, Manufacturing, Suppliers
- Major buy or Build decisions for the sub-systems can be made during this phase.
- All product implementation creativity takes place here. If the team agrees to the PRS then suspend all further modifications ('freeze' it) and implement change control management (SOP).
- Subsystem design creativity takes place here.
- Assess PRS changes and implement with Product Change Requests (may need to go back to previous phase). Then freeze the PRS at the end of this phase.
- Don't freeze the DDOC and DTR2 at this point, as they may change somewhat during the implementation and verification stage, but do implement the change control process on all documents.
- Some production and quality control (QC) concepts are preliminarily developed, but not yet detailed - see Product Engineering - What's Quality Got to do with it?
- Acquire development tools.
- If the business case is not acceptable at the end of this phase, the project can be stopped with moderate financial losses; however, this is the last chance to do this without incurring extensive losses.
 |
JUMP TO PAGE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
©1999, 2005, Richard M. (Dick) Haney
|