- Plan Supply Chain Management, procurement and Production Processes (MDOC)
- Update the Theory Of Operations (DDOC)
- Update PRS and preliminary manufacturing documentation. (DDOC, MDOC)
- Update manufacturing tests, test equipment and validate as required (especially medical products). (MDOC)
- Update Manufacturing test, service and QA/QC procedures (MTR2)
- Preliminary, standards, environmental and regulatory agency review/tests. (MDOC)
- CAD output (DDOC, MDOC)
- Prototype Models
- Hazard and fault analysis review (MDOC)
- Manufacturer liaison & selection. (MDOC)
- Manufacturing, QA, Service plan (MDOC)
- Manuals, Labels, Cables & Accessories. (MDOC)
- Fabricate and assemble.
- Verify to Integration Verification Plans. Execute DVT & alpha tests. (MDOC)
- Update manufacturing tests & equipment. (MDOC)
- Review Procurement, Manufacturing test & QC procedures. (MTR2)
- Hazard and fault analysis review. (MDOC)
- Preliminary agency and environmental tests and submittals (MDOC)
- Final tooling established (MDOC)
- Final QC & Service documents reviewed. (MDOC)
- Verify 'procured parts' as required.
- Final Manufacturing documents reviewed. (MDOC)
- Integrate and test to Integration Test Plans. (MDOC)
- Test and verify systems and subsystems to DTR2 and PRS respectively (Design Verification Tests)
- Refine COM and COGS (DDOC, MRD - change control is in effect for the MRD)
- Objective design review and fault analysis completion
- Manufacturing selection and liaison solidified
- Design trouble-shooting procedures for efficiently testing and repairing nonfunctioning product (later use by manufacturing and service groups) (MDOC, MTR2)
- Begin promotion of product
- Investigate shipping, distribution and 'shelf space' issues
- All test results and any compliance certificates from standards or regulatory activity (DTR2)
|